HELIOS Phase II — evidence package¶
Last refreshed: 2026-05-18 (initial assembly) Status: incremental — refreshed each session as new artifacts ship.
This directory holds the Phase II proposal evidence package — operator-facing summary material curated from the existing HELIOS portfolio, ready to embed in the Phase II proposal narrative or hand to NASA-center reviewers as a one-shot orientation packet.
Read these in order¶
evidence-package.md— the single curated summary covering the 7 evidence categories (lead narrative, public artifacts, Gannon ground-truth observations, RFC engagement, Sprint C-Training methodology evolution, kill-gate placeholder, arXiv placeholder). This is the document the operator hands to reviewers. An auto-built PDF is uploaded as a workflow artifact on every push tomainvia.github/workflows/phase-ii-pdf.yml.commercialization-plan-refined.md— Phase I learnings → Phase II strategy refinement. Cites 5 specific Phase I learnings with cross-links to source artifacts. Refines proposal §6.2 revenue model and §6.3 go-to-market based on what Phase I actually surfaced.phase-ii-proposal-draft.md— section-by-section scaffold mirroring the submitted Phase I proposal's §1-8 structure, with placeholders flagging the Phase II adjustments (§1.3 Gannon retrospective → v2 real-SPP; §2 → Phase II success criteria; §3.3 vision → execution plan; new §4.3 "Phase I results" with cross-links to the evidence package).
Operator-action subdirectories¶
Each holds a README inventory plus .gitkeep placeholder. No fake LoI PDFs. The operator fills these as outreach lands.
| Subdirectory | What it tracks | Operator action |
|---|---|---|
letters/ |
8 LoI slots (ML engineer · SME consultant · ≥2 NASA-center · ≥2 ag-industry · 2 spare) | OPERATOR_TODO.md item 6-7 |
customer-discovery/ |
≥10 prospective customers (Ohio/Midwest cooperatives, large family operations, OEM platform teams) | OPERATOR_TODO.md item 5 |
nasa-engagement/ |
CCMC · M2M SWAO · SRAG · SPoRT contact records | OPERATOR_TODO.md item 7 |
Refresh policy¶
Each refresh = a small focused commit with the trigger noted in the commit message and the Last refreshed line above advanced.
| Trigger | Refresh action |
|---|---|
| Sprint D ships | Replace the §6 kill-gate placeholder in evidence-package.md with real HSS / Brier / CRPS numbers + reliability-diagram PNG + results/<date>-killgate.json cross-link |
| arXiv submitted | Replace the §7 arXiv placeholder with arXiv:YYYY.NNNNN + DOI + cover letter URL |
| TFT-TEC ships | Update Gannon ground-truth observation #3 (TEC 55.1 TECU) from CDDIS-synthetic to CDDIS-real and gannon-storm-rtk-analysis to v0.2.0 (v2 real-SPP) |
| LoI lands | Drop the signed PDF into letters/; update letters/README.md inventory row |
| Customer-discovery interview | New file at customer-discovery/YYYY-MM-DD-<organization>.md; update inventory |
| NASA-center engagement record | New file at nasa-engagement/<center>-YYYY-MM-DD.md; update inventory |
The auto-render workflow (phase-ii-pdf.yml) rebuilds evidence-package.pdf on every push to main that touches phase-ii/evidence-package.md. The PDF is downloadable from the workflow run. Stale signals: if Last refreshed is more than 60 days behind the most recent companion footnotes-sync commit, the operator runs a top-to-bottom refresh.
Cross-references¶
- Submitted Phase I proposal (locked):
/home/twawe/577i-Projects/SBIR Working Folder/NASA/HELIOS_NASA_SBIR_PhaseI_Proposal.docx - Public companion (the lead narrative):
../companion/companion.md - Master plan:
../plan/master-plan.md - Dispatch spec for this assembly:
../specs/2026-05-18-PhaseII-evidence-assembly-spec.md - Operator TODO:
../OPERATOR_TODO.md